Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace
Good Design And Quality Embroidered bow Lace, Collar Lace

Good Design And Quality Embroidered bow Lace, Collar Lace

Model NO.:
LY53-3125
Price:
USD 0.50-1.00 / pieces
Delivery:
FOB
Minimum order quantity:
500 pieces
Supply Ability:
5000 pieces / Day
Country of Origin:
Ningbo Shanghai
Quantity:
  • Product Type:Lace
  • Place of Origin:CN;ZHE
  • Width:17.5 x 14 CM
  • Material:100% Cotton
  • Model Number:LY53-3125
  • Brand Name:LEMO
  • Feature:Sustainable
  • Feature:Water Soluble
  • Technics:Embroidered
  • Fabric Type:Mesh
  • Feature:embroidered lace collar
  • Decoration: bow Lace
  • bow Lace Necklace Material:100%Cotton
  • Size:17.5 x 14 CM
  • Packing:50pcs per polyester bag
  • Use:Garment, Gecoration,etc
  • Shipment:By Air, By Ship, By Train
  • Sample:Free
  • Sample Time:3-7 days
  • Payment:T/T, L/C
  • MOQ:500 pcs Lace Necklace
  • Color:Black, White, bow Lace

                        Good Design And Quality Embroidered bow Lace, Collar Lace

Product Description
LY53-3125,600  
Good Design And Quality Embroidered bow Lace, Collar Lace
Material100% Cotton                                                                
SampleFree
DesignAs Required
Color Card PANTONE
Size17.5 x 14 CM
Advantage High Quality and Competitive Price 
MOQ 500/pcs
Logo Customized 
Feature AZO Free .Nickel Free High Polish 
Certification OEKO-TEX STD 100. ISO 9100 Certification 

 

Color of Good Design And Quality Embroidered bow Lace, Collar Lace

1 (1).jpg 

Hot Selling Items

 

LY53-3120,200LY52-2355,200LY55-5046,200
LY52-2306,200LY88-8465,200LY88-8381,200
Company Information

Our lace factory has been established for more than20 years.

We Own 100 production lines of embroidery lace, 50 production lines of tricot lace.

We have more than 10 years experience in exporting, mainly exported to South America, Middle East and Southeast Asia,and we are getting stronger and stronger by providing our good quality and service. 

We are particularly acting our major role by having a strict watch quality during the production, and feedback the right information to our customers. 

.jpg

Packaging & Shipping

 .jpg

 

Why choose LEMO?

 

HTB1P1JrMFXXXXcBXpXX760XFXXXx.png

.png 

Our Services

 

1) Your inquiry will be replied within 12 hours.

2) Well-trained & experienced sales can reply your inquiries in English.

3) Working time: 8:30 am ~6:00 pm, Monday to Friday (UTC+8).During working time, E-mail will be replied to you within 2 hours

4) OEM & ODM projects are highly welcomed. We have strong R&D team.

5) The order will be produced exactly according to order details and proofed samples. Our QC will submit inspection report before shipment.

6) Your business relationship with us will be confidential to any third party.

7) Good after-sale service. 

 

FAQ

 Q1:Are you manufacture or trading company?

A:We are manufacture.Our LEMO group have6 factories.

 

Q2:Do you have certificates?

A:Our products can pass Oeko-Tex standard 100,ISO9001:2008 and so on,our factories get BSCI,SGS,UNP supplier and other certificates.

 

Q3:How long your company have been building?

A:Ourcompanyhave been specialized in garment accessories for over 20years.

 

Q4:What’s your main products?

A:Our main products include button,zipper,lace,thread,hook&loop,Hanging Tablets etc. 

  

Q7:What is your delivery time?

A: 1x40HQ of zipper can be finished in 15days, 1x20ft can be finished in 10days;

 

Send Message

*
*

Send Message

*
*
Choose language